Solution
Uninterrupted air conditioning was guaranteed thanks to units from the HTW range
In three different Egyptian power plants with Rankine gas, photovoltaic and wind power supply, Siemens has chosen HiRef's monobloc piggyback units for the conditioning of the shelters, which contain electrical and electronic equipment. Overall, 250 units were installed which guarantee 24 hour service continuity all year round.
Units installed:
250x HTW01451
Submit an inquiry
We will be happy to reply as soon as possible.